Posts in November 2000

Gardens and Grounds

Uncategorized | 0 comments | by John Hallman

read more

blog_11-7

Uncategorized | 0 comments | by John Hallman

read more

Orthopedic Rehab

Uncategorized | 0 comments | by John Hallman

read more

featured_blog_5-20

Uncategorized | 0 comments | by John Hallman

Resident “Skip” Chard dances with Sandy Heath, a recreation aide at Witherell.

read more

featured_blog_5-19

Uncategorized | 0 comments | by John Hallman

Third from left) Ken Bowes, Vice President of Distribution for Eversource Energy, presents a check for $4,490,918 to Greenwich First Selectman Peter J. Tesei (third from right), to offset the construction costs of The Nathaniel Witherell’s Project Renew. Also present were: Lloyd Bankson III (left), Witherell Board Member; David Ormsby (second from left), Chairman of the Board of Nathaniel Witherell and Friends of Nathaniel Witherell; Allen Brown (second from right), Witherell’s Executive Director; and H. Andrew Fox (right), Co-Chair, Town of Greenwich Building Committee for Project Renew.

read more